1
/
de
1
20 Meter Long Lead
20 Meter Long Lead
Prix habituel
£19.99 GBP
Prix habituel
£29.99 GBP
Prix promotionnel
£19.99 GBP
Prix unitaire
/
par
Taxes incluses.
Frais d'expédition calculés à l'étape de paiement.
Impossible de charger la disponibilité du service de retrait
This 20 Meter Long Lead is designed with reflective material for increased visibility and is made with strong, durable materials for long-lasting use.
Ideal for long walks or training sessions, this lead provides both safety and convenience for you and your pet.
Share
